Wellube’s Specialised Testing and Isolation Solutions for Weld Integrity
Diamond Wire Saws used for Platform Decommissioning in KSA
Wellube Performs High Pressure Gate Valve Milling on Wellheads to
Front-End Engineering Design and 14” Hot Tapping on 42” &
High Pressure Gas Leak Sealed Online with a 42” Enclosure
Platform Leg Decommissioning Completed in 7 Months
42” Hot Tapping on 48” #600 Crude Oil Pipeline and
68” Enclosure Clamp ensures continuous plant operability
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
If you wish to submit a job application, please submit here