Wellube has recently announced a joint cooperation agreement with Kazakhstan-based Caspian
Platform Leg Decommissioning Completed in 7 Months
Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.
Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria
Successfully completed a 10” and 12” double position line stop operation in Nigeria.
Wellube and Innovo successfully complete a decommissioning project in the Middle East region
Wellube, with Innovo, successfully completed a multi-million-dollar decommissioning contract in the Middle East region.
20” Chilled Water Line Isolated Successfully Using Pipe Freezing in Oman
Simultaneous double position pipe freezing performed on 20” chilled water lines in Muscat.
68” Enclosure Clamp ensures continuous plant operability
Continuous plant operability managed by performing online leak sealing on a 68” pipe flange.
Wellube Completes Pipe Freezing Project at Burj Khalifa
Wellube successfully completed a Pipe Freezing project at Burj Khalifa, the world’s tallest building.
Wellube Announces Collaboration with KSB Group
Wellube, the leading integrated subsea and offshore solution provider, has announced today that its Wellube
66” water line hot tapped in 36 hours
Successfully performed line stopping and hot tapping on a live 66″ cooling water line.
Specialised pipeline clamp avoids pipeline disruption
Specialist pipeline leak clamp designed & delivered to avoid costly production disruption for client.









