2” Line Stopping Completed with Barrel Split Tee
Wellube Performs High Pressure Gate Valve Milling on Wellheads to
68” Enclosure Clamp ensures continuous plant operability
Flare Line Leak Sealed Online with a 24” Large Enclosure
Steam Leak on an Exchanger Flange Sealed with a 6-part
18” Water Pipeline isolated by Pipe freezing
Diamond Wire Saws used for Platform Decommissioning in KSA
48” Hot Tap on Drinking Water Pipeline Successfully Completed with
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
If you wish to submit a job application, please submit here